Oil
Upstream logistics vector
Port of Açu Oil Terminal currently handles around 30% of the oil exported by Brazil through double banking operations carried out by its affiliate Vast Infraestrutura.
As one of the main upstream logistics stakeholders, Vast leads a project to expand the infrastructure for tanking and distribution of oil, which will increase the national storage capacity, also creating strategic stock for refineries supply and for other liquids operation for the Energy sector.
Tanking and pipeline project to connect Açu to the national grid, consolidating the state of Rio de Janeiro in the oil production and logistics chain
Storage area with a capacity for 5.5 million barrels
Cargo consolidation for double banking operation
Generation of about 2,000 direct and indirect jobs
Estimated investment of R$2.5 billion
Expected start of operations: 2024